BESS Procurement Checklist Solarbe Global Use this checklist before requesting quotations from battery energy storage suppliers. 1. Project context - Country and installation site - Application: peak shaving, backup power, PV self-consumption, microgrid, diesel replacement, grid service - Expected system capacity: kWh / MWh - Expected PCS power: kW / MW - Discharge duration - Grid condition and backup requirement - Indoor or outdoor installation - Target commissioning date 2. Technical requirements - Cell chemistry and cell supplier - Container or cabinet configuration - BMS architecture - EMS functions - PCS compatibility - HVAC / thermal management - Fire detection and suppression - IP rating and corrosion protection - Operating temperature range - Remote monitoring requirement 3. Compliance and safety evidence - Required certification by target market - Cell test reports - Battery module / rack / system certification - Fire safety documents - Grid connection documents - Transportation documents - Installation manual - Operation and maintenance manual 4. Commercial and service questions - Warranty term and exclusions - Performance guarantee - Delivery time and Incoterms - Spare parts policy - Local service partner availability - Remote technical support process - Commissioning support - Failure response time 5. RFQ discipline - Ask every supplier to quote against the same capacity, PCS size, discharge duration, warranty term and delivery terms. - Do not compare prices before normalizing scope. - Record missing documents as risk notes, not as small details.