What must remain available?
Define the facility, users, critical equipment, operating hours and tolerated interruption for each load group.
An island hotel, cold store, clinic, commercial site or public facility has a different critical load and duty of care. Fuel and equipment logistics, salt exposure, communications, spares and post-storm recovery belong in the same energy brief.
Project-owned concept visual, not a Solarbe project photograph, product certification or local delivery claim.Technology cannot replace a clear operator, payment path and recovery responsibility.
Define the facility, users, critical equipment, operating hours and tolerated interruption for each load group.
Record grid or cooperative supply, diesel or other backup, fuel route, existing solar, metering and the causes and pattern of interruptions.
Name the owner, operator, technician, spare-parts route, remote-support path and decision maker after a fault or severe-weather event.
The equipment package must match environment, logistics, control and the people available to maintain it.
Check usable area, wind exposure, salt and humidity, shading, access, mounting, cleaning and transport to the site.
Define the operating function, usable energy, power, charge source, thermal conditions, enclosure, safety files and replacement path.
Explain the grid, generator, PV, storage, load priorities, black-start/restart logic, communications, alarms and manual fallback.
Show who can inspect, isolate, restart, repair and document the system, including logistics after severe weather.
Unknown conditions should remain open. They should not be replaced with a generic island-system size or savings percentage.
National portals are starting points. The project must also use the current documents of the relevant utility, electric cooperative, local government and appointed professionals.
Renewable-energy programmes, power-sector information and national policy references.
RegulationEnergy Regulatory CommissionRegulatory issuances and consumer, distribution and connection information.
Electric cooperativesNational Electrification AdministrationOfficial entry point for the cooperative and rural-electrification context.
Solarbe Global can organise the requirement, align RFQ fields and prepare China-side product evidence questions. Local design, approval, installation and performance responsibility remain with the appointed parties.