What must stay on?
Identify critical equipment, operating hours, start-up demand, tolerated interruption and the cost of losing the process.
A factory or warehouse may be solving continuity, peak demand, self-consumption, connection limits or coordination with an existing generator. The first useful comparison is the operating brief that every system proposal must answer.
Original concept scene, not a Solarbe project photograph, product certification or local delivery claim.The same equipment list can produce different outcomes when the load, grid arrangement and responsibility for service are different.
Identify critical equipment, operating hours, start-up demand, tolerated interruption and the cost of losing the process.
Record grid connection, tariff category, rooftop or ground space, generator, solar system and any connection or export constraint.
Separate an early budget, technical option, RFQ, supplier comparison and investment decision. Each stage needs a different evidence pack.
A complete response explains how the parts work together and who remains responsible after delivery.
Use the available roof or land, operating hours, temperature and connection conditions to define the relevant product evidence.
State the required function, charge window, discharge duration, cycling assumption, usable energy and safety documentation.
Confirm power-conversion scope, grid and backup modes, generator coordination, monitoring, alarms and access responsibilities.
Ask who surveys, installs, commissions, holds spares, responds to faults and records the operating history in the target city.
Approximate information is useful when it is labelled. Unknown fields should remain open instead of being replaced with a generic system size.
These official starting points do not replace the current tariff, municipal authorisation, engineering or safety documents that apply to a specific site.
Electricity regulation, decisions and consultation material.
Supply and tariffsEskom DistributionPublished tariff and distribution information for the applicable supply context.
Municipal exampleCity of Cape Town SSEG routeAn example of why the exact municipality and connection route must be checked.
Solarbe Global can organise the requirement, align RFQ fields and prepare China-side product evidence questions. Local engineering approval, installation, certification and performance responsibility remain with the appointed parties.